|
DIFFERENCE OF SUMName:
<SUBSET/EXCEPT/FOR qualification> where <y1> is the first response variable; <y2> is the first response variable; <par> is a parameter where the computed difference of the sums is stored; and where the <SUBSET/EXCEPT/FOR qualification> is optional.
LET A = DIFFERENCE OF SUM Y1 Y2 SUBSET X > 1
SKIP 25
READ IRIS.DAT Y1 TO Y4 X
.
LET A = DIFFERENCE OF SUM Y1 Y2
TABULATE DIFFERENCE OF SUM Y1 Y2 X
.
XTIC OFFSET 0.2 0.2
X1LABEL GROUP ID
Y1LABEL DIFFERENCE OF SUM
CHAR X
LINE BLANK
DIFFERENCE OF SUM PLOT Y1 Y2 X
CHAR X ALL
LINE BLANK ALL
BOOTSTRAP DIFFERENCE OF SUM PLOT Y1 Y2 X
Dataplot generated the following output.
***************************************
** LET A = DIFFERENCE OF SUM Y1 Y2 **
***************************************
THE COMPUTED VALUE OF THE CONSTANT A = 0.41789999E+03
******************************************
** TABULATE DIFFERENCE OF SUM Y1 Y2 X **
******************************************
* Y1 AND Y2
X * DIFFERENCE OF SUM
**********************************************
1.00000 * 78.9000
2.00000 * 158.300
3.00000 * 180.700
GROUP-ID AND STATISTIC WRITTEN TO FILE DPST1F.DAT
|
Privacy
Policy/Security Notice
NIST is an agency of the U.S.
Commerce Department.
Date created: 03/27/2003 | ||||||||||||||||||||||